Element C (Iteration 2): Justify Revised Design Requirements

1 min read • Assignment

Week 15: Justify Revised Design Requirements

PLTW Element C, Iteration 2 — Presentation and Justification of Solution Design Requirements, revised to industry grade.

Revise the PRD

  • Take your Sprint 1 PRD and tighten every metric to an industry-grade standard — the kind of spec a real engineering team would be held to, not a rough first-pass target.
  • Every metric must remain quantifiable (e.g. “reduce false-negative rate from 12% to under 3%,” not “improve accuracy”).

Justify Every Change

  • For each revised metric, cite the evidence driving the change: an FMEA failure mode (Element B), external evaluation feedback (Element J), or mentor input.
  • A metric with no cited justification is a metric to cut or reconsider.

Peer Review

  • Trade your revised PRD with another team, same as Sprint 1’s peer review.
  • Have them specifically check: is every metric measurable with your team’s actual tools and remaining timeline? Flag anything that looks unfeasible.

Core Deliverables

  • Revised, industry-grade PRD with quantified metrics.
  • Justification for each metric change, tied to FMEA/evaluation evidence.
  • Peer review notes from the partner team.

Submit Assignment

Click to upload or drag and drop
PDF, ZIP, images, documents, or Jupyter notebooks (.ipynb) (Max 10MB per file)

Need to update a submission later? Open the submissions dashboard.